Residential · 5 kW On-Grid

Deshmukh Family Home

Rajapeth, Amravati

Problem: Monthly bill of ₹4,800 and rising every year. AC usage in summer pushed bills past ₹6,500.

What we did: 5 kW system with Tier-1 panels · PM Surya Ghar subsidy filed and credited · MSEDCL net metering active in 20 days.

Result: Bill ₹4,800/month → ₹450/month · ~₹52,000 saved per year · Payback ~4 years.

Before₹4,800/mo
After₹450/mo
Annual Saving~₹52,000

Commercial · 50 kW

Multi-Speciality Hospital

Wardha

Problem: Electricity was the hospital's second-biggest operating cost (~₹80,000/month).

What we did: 50 kW rooftop plant covering ~70% of daytime load · Installed in phases with zero disruption.

Result: Saving ≈ ₹55,000 every month · Payback expected under 4 years.

Before~₹80,000/mo
Saving₹55,000/mo
Payback< 4 years

Industrial · 120 kW

Textile Processing Unit

MIDC, Amravati

Problem: High per-unit HT power cost was squeezing margins against competitors.

What we did: Shed-mounted 120 kW plant · Structural audit · CEIG and DISCOM liaison end-to-end.

Result: Per-unit power cost cut by ~60% on solar generation · 3 years of same-day service response.

System120 kW
Cost Cut~60%
ServiceSame day

More Installations

3 kW Residential — Badnera: Bill ₹2,900 → ₹280. Subsidy ₹78,000 credited in 38 days.
7 kW Residential — Camp Area, Amravati: Bungalow with 2 ACs, bill down 85%.
25 kW — School, Achalpur: Daytime load fully covered; savings fund two teacher salaries.
40 kW — Dal Mill, Wardha: Processing cost reduced; payback 3.8 years.
10 kW — Clinic + Residence, Paratwada: Combined connection optimised with net metering.
60 kW — Cold Storage, Amravati: Daytime compressor load on solar; grid only at night.